SUBSTRATE: OFF-GRID, UNDERGROUND AI DATA CENTRES
For sovereign / mission-critical workloads.
THE CONSTRAINTAI's bottleneck is DATA CENTRE DESIGN
The industry’s current proposal is to concentrate the global economy and military command stack into AI data centres — while building grid-dependent, monolithic capacity above ground, in natural disaster zones, with little protection against drone attack.
10 YR DELAYS
Grid connection timelines are approaching a decade
79%
Of the existing data centres are in high-risk weather zones
40%
Of planned US data centres are in significant-to-very-high tornado zones
670+
Drone incursions around military and critical infra across the US, UK + EU
AND THERE ARE NEW THREAT VECTORS
■ 01 | NEW THREAT VECTOR March 2026, 3 AWS data centres were attacked by Iranian drones.
Iran labelled major cloud and tech assets "enemy technology infrastructure", claiming the facilities support U.S. military and intelligence operations in the Gulf.
MILITARY TARGETS
■ 02 | NEW THREAT VECTOR2021, US authorities arrested a man who allegedly plotted to bomb an Amazon data centre, which he believed would "kill off about 70% of the internet".
Law enforcement agencies across the US, UK, EU, Japan, South Korea and South America have explicitly warned developers that high public anger over the massive energy and water demands of AI data centres poses a risk of physical incursions and public protest movements, prompting calls for robust facility security.
SABOTAGE
SEARCH FOR ALTERNATIVE DATA CENTRES EXPENSIVE, AWKWARD, RISKY
The industry is exploring alternative data centre designs to address these challenges. Each approach offers potential advantages, but also introduces significant trade-offs.
Non-exhaustive list below.
ORBITAL DC✓ Free unlimited solar energy
✓ Reduced permitting friction
✓ Modular + Scalable
X Extreme maintenance challenges
X Deployment requires large, reusable rockets
X New threat vectors: Anti-Satellite Weapons, Collisions, Radiation
OFF-SHORE DC✓ Independent low-cost wave / nuclear energy
✓ Reduced permitting friction
✓ Free, unlimited cooling
✓ Modular + Scalable
X Expensive off-shore platform maintenance
X Deployment requires boats + marine operations
X New threat vectors: Piracy, Cable Exposure, Sea Water, Storms
UNDERWATER DC✓ Free, unlimited cooling
✓ Reduced permitting friction
✓ Modular
X Extreme maintenance challenge
X Deployment and scaling requires boats + marine operations
X New threat vectors: Cable Exposure, Sea Water, Underwater Drones
■ THERE IS A BETTER WAY
UNDERGROUND✓ 30-50% less energy demand
✓No grid interconnection delays or costs, uses existing headroom within local grids.
✓ Reduced permitting friction , very low visual impact and surface footprint
✓ Modular + Scalable
✓ Cooling enabled by sale of waste heat to local off-taker / landlord
✓ Conventional maintenance
✓ Resistant to extreme weather, surveillance + physical attack
✓ Combines the colocation capabilities of edge with the power of hyperscale.
X Geology + groundwater constrain some sites
X Higher upfront excavation + civil cost
X Challenging large-scale equipment replacement
SUBSTRATE
OFF-GRID UNDERGROUND DATA CENTRESGoing UNDERGROUND unlocks unparalleled scalability + RESILIENCE
Standardized compute platform 0.6–10 MW
10X
10x faster deployment than above-ground .
Factory-built modular units deploy in 6 months, not 6 years.
<1.06 PUE
Zero water, immersion-cooled efficiency.
High-density compute with minimal cooling overhead. Waste heat directed to off-taker or ground borehole.
LOCATION POSITIVE
Deploy anywhere. Imperceptible impact.
Resilient, community-positive compute wherever it’s needed. No freshwater use, pollution, noise or impact on views. Grid balancing and lower heating and cooling costs for off-take partners.
1GW
1GW per factory per year.
Standardised production enables industrial-scale deployment and parallel delivery.
10x faster deployment than above-ground .
Factory-built modular units deploy in 6 months, not 6 years.
10X
Zero water, Immersion-cooled efficiency.
High-density compute with minimal cooling overhead. Waste heat directed to off-taker or ground borehole.
<1.06 PUE
Deploy anywhere. Imperceptible impact.
Resilient, community-positive compute wherever it’s needed. No freshwater use, pollution, noise or impact on views. Grid balancing and lower heating and cooling costs for local off-take partners.
LOCATION POSITIVE
1GW per factory per year.
Standardised production enables industrial-scale deployment and parallel delivery.
1GW
COMMUNITY POSITIVE
Imperceptible impact. Lower bills.
No freshwater use, pollution, noise or impact on views. Grid balancing and lower heating and cooling costs for off-take partners and district thermal energy networks.
WE BRING OUR OWN UNDERGROUND POWER.
POWERLOW CARBON | 24/7 | OFF-GRID | FIRM POWER
SUBSURFACE ENHANCED GEOTHERMAL ENERGY ORCUS
Each campus is powered by an array of subsurface geothermal silos. Neither the compute nor its power source can be easily disrupted by extreme weather or kinetic attack.
SUBSURFACE ENHANCED GEOTHERMAL ENERGY 24/7 | Behind the meter | Firm energy generation
ORCUS
24/7 | Behind the meter | Firm energy generation
SUB-SURFACE ENHANCED GEOTHERMAL ENERGY
137 GIGAWATTS
Projected global data-centre electricity demand by 2035.
Equivalent to 1200 TWh/year.
42 TERRAWATTS
5 km below the Earth’s surface.
Technical potential for electricity generation from enhanced geothermal resources. 300x projected 2035 global data-centre power demand.
600 TERRAWATTS
8 km below Earth’s surface.
Technical potential for electricity generation from enhanced geothermal resources. 4380x projected 2035 global data-centre power demand
18 MONTHS
Projected behind-the-meter build time for a standardised 50 MW enhanced-geothermal power module.
IEA technical potential estimates for enhanced geothermal systems; not installed capacity.
THE CAMPUS GROWS ON DEMAND
SCALEIN 3 STEPS
Drill a new shaft.
Shaft drilling and formation occur simultaneously.
01
Install and connect mass manufactured compute platforms.
Each shaft represents 0.6-10MW of compute, plus reusable heating and cooling energy.
02
Repeat.
Add compute and power modules as demand grows.
Underground power generation scales with the campus using the same subterranean infrastructure platform.
03
MW TO TW.
MULTIPLE DEPLOYMENT ENVIRONMENTS.
◉ MW nodes | ◉◉◉ GW campuses | ✦—✦—✦ TW network
WHEREVER ITS REQUIRED
Private, MW-scale compute beneath research campuses.
BIOTECH CAMPUSES
■ 01 | LIFE SCIENCES AND RESEARCH
■ 02 | ENTERPRISE + SOVEREIGN AISOVEREIGN ENTERPRISE AI
1 - 10 MW of proximate, dedicated AI compute that enterprises can control on or near their operations.
■ 03 | DEFENCE AND NAT-SEC MILITARY BASES
Sovereign, hardened, scalable compute for mission-critical and C2 workloads. Proximate and climate-agnostic. Fibre with Laser SATCOM backup.
■ 04 | SPACE INFRASTRUCTURESPACEPORTS + GROUND STATIONS
Local compute for spaceports, ranges, laser and RF ground stations and mission operations.
Behind the meter compute where power is already abundant and affordable. Reducing expensive energy curtailment costs.
ENERGY SITES
■ 05 | ENERGY INFRASTRUCTURECONTACT
We work with AI operators, developers, landlords, ground-station operators, energy partners, and investors.